Plastic PVC pipe Water Pipe Making Machinery Production Line Customization Factory Price
PVC Pipe Making Machine Introduction
1.PVC pipe machine is mainly used in the manufacture of the plastic PVC pipe with various tube diameters and wall thickness in the aspects such as the agricultural and constructional plumbing, cable laying etc.
2.This PVC Pipe Production Line is composed of the conical twin-screw extruder, vacuum calibration tank, printer, haul-off, cutter, stacker, etc.
3.The extruder and extractor adopt the inverter device.
4.The vacuum pump and the main motor adopt the famous brand.
5.The haul-off has many different kinds of Model, such as two-claw, three-claw, four-claw, five-claw, six-claw.
6.About the cutter, you can choose the saw blade cutting type or the planet cutting type.
7.We also can offer some auxiliary machine about the pvc conduit pipe making machine. With its wide range including various technical solutions, Our production does not only include standard machines, but also offers complete pipes extrusion lines, tailor-made according to the customers' requirements, still assuring high performances and competitive prices.
8.The pvc pipe machine price can produce pipes in PVC materials, with diameters starting from 16mm up to 630 mm.
Production Flow
PVC powder + additive → mixing → spring feeding → twin screw extruder → mould and calibrator → vacuum forming machine → haul off machine → cutting machine → stacker
Extruder
Mold
Vacuum & Water cooling tank
Hual-off & Cutting machine
1. High output: Ensure you the highest output as compared with other supplier.
2. New technology gear box: High torque gear box, one body design, two cooling system.
3. Screw and barrel: Bi-metal material ensure longer working life, ensuring running non-stop 24 hours /day.
4. Energy saving heater: Heater on the barrel is energy saving type by 15%.
5. Electric elements and box: In detachable, with world famous brand such ABB, Siemens, Delta, well organized.
6. Siemens PLC control system: With operation easy, management full, energy saving and counting, and intelligent control system.
7. Pipe brighten device: To make the pipe shining and smooth.
8. Vacuum tank stainless steel 304: Water level and temperature controlled automatically.
After-Service
- After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply,
water supply, labors and cranes, etc.
- Trusty will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
- The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated,
- Engineer will give free training lessons to labors in buyer's factory.
- If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
Package & Transpotation
FAQ:
1.Why Choode Us
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.What Services Do We Offer?
Pre-sale communication → Design proposal, signature confirmation→Customized production→ Test machine before shipment →Package &delivery→ Engineer installation→Training operator → Technical support
3.Payment Terms:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.Delivery Conditions:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
5.Warranty Terms
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6.Inspection
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.Installation And Equipment Commissioning:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.
Feel free to contact me!