Customization: | Available |
---|---|
After-sales Service: | Installing in Customer′s Factory |
Warranty: | 14month |
Still deciding? Get samples of US$ 0/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
PET PP strap band belt making extruder production line
PET PP strap band belt making extruder production line can produce different width and thickness PET strap according to client's requirement.
100% recycled material can be extruded by our PET strap extrusion machine. which can reduce the produce cost and get a good profit. And the PET strap is the substitution of the steel strap and has lots of advantages such as good extension, high temperature resistance, easy use, etc.
Model | SJ65/30-PP | SJ90/30-PP/PET | SJ100/30-PP/PET | SJ120/33-PP/PET |
Material | PP | PP/PET | PP/PET | PP/PET |
Strap Width | 8-19MM | 5-32MM | 5-32MM | 5-32MM |
Thickness of strap | 0.45-1.25MM | 0.45-1.5MM | 0.45-1.5MM | 0.45-1.5MM |
Production speed | ≤120M/min | ≤120M/min | ≤120M/min | ≤120M/min |
Outlet of Die head | 2 straps one time | 2 or 4 straps one time | 2 or 4 straps one time | 4 or 6 straps one time |
Stretching ratio | 4-6 | 4-6 | 4-6 | 4-6 |
Max. capacity | 100kgs/h | 120kgs/h | 200kgs/h | 400kgs/h |
Machine Name | Quantity |
PET dehumidifing & crystallization system | one set |
SJ-75/33 or SJ-90/33 single screw extruder | one set |
Filter Exchanger | one set |
Machine head mould | one set |
Water cooling tank | one set |
Drying system | one set |
First pre heating machine | one set |
First tensile pre heating machine | one set |
Second tensile embossing cooling machine | one set |
Tight hot calibration machine | one set |
Third haul-off machine | one set |
Shortwave infrared ray heating tank | one set |
Double winder | one set |
Electric control system | one set |
Qingdao Trusty Plastic Machinery Company,which is a professional plastic extrusion equipment manufacturer integrating design, development, production and sales.The main products of our company are rich. The production technology is mature. And the after-sales is professional and guaranteed.Our products were sold throughout the country and even abroad, such as: Pakistan, Vietnam, India, Algeria, Egypt and other regions.
Our company's main products are: PVC door and window profile production line, WPC wood-plastic profile production line, PVC wall panel production line, PVC/PE/PPR pipe production line, crust-foamed board production line, PE/PP/PC hollow sheet production line, PVC roof tile production line and PET packing belt production line, etc. According to customers' needs, to achieve diversified processing customization.
1.WHY CHOOSE US
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.WHAT SERVICES DO WE OFFER?
Pre-sale communication → Design proposal, signature confirmation→Customized production→ Test machine before shipment →Package &delivery→ Engineer installation→Training operator → Technical support
3.PAYMENT TERMS:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.DELIVERY CONDITIONS:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
5.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6.INSPECTION
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.INSTALLATION AND EQUIPMENT COMMISSIONING:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.