Customization: | Available |
---|---|
After-sales Service: | Oversea Installation&Debugging |
Warranty: | 14 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Advantage we make
>>Features: with 100% bottle flakes recycled material, to produce various specifications of PET strap. Adopting unique design of dry system to confirm viscosity of material and final straps quality, dimensional stability good straight to confirm straps can be used in automatic packing machine.
>> Infrared crystal dryer -----Dry &Crystallize R-PET flakes/chips in 20mins at 30ppm by saving 45-50% energy cost.
1 | Reduce manufacture cost of PET strap: Up to 60% less energy consumption than conventional drying system |
2 | Instant start-up and quicker shut down --- No need pre-heating |
3 | Drying& crystallization will be processed in one step |
4 | To improve the tensile strength of PET Strap,Increase the added value --- Final moisture can be ≤30ppm or 100ppm by 20mins Dry &Crystallization |
5 | The machine line is equipped with Siemens PLC system with one key memory function |
6 | Covers an area of small, simple structure and easy to operate and maintenance |
7 | Independent temperature and drying time set |
8 | No segregation of products with different bulk densities |
9 | Easy clean and change material |
Technical specification
Machine name | PET strap making machine |
Place of origin | QingDao,China |
Certification | ISO9001-2000;CE |
Raw material | PET Bottle Flakes |
Output | 80-500kg/h |
Product width | 9-32mm |
Product length | according to customer's requirement |
Machine size | length (30-50m)*width (5m)*height (5m) |
Contactor | Siemens |
Inverter | ABB |
Temperature controller | Omron |
No. | Main Extruder | Capacity |
1 | SJ75/30 Single screw extruder | 100kg/h |
2 | SJ90/30 Single screw extruder | 200kg/h |
3 | SJ110/30 Single screw extruder | 300kg/h |
4 | SJ120/30 Single screw extruder | 400kg/h |
5 | SJ135/30 Single screw extruder | 500kg/h |
No. | Name | Qt'y |
1 | Automatic Feeder | 1 set |
2 | Infrared crystal dryer | 1 set |
3 | SJ-90/30 Single Screw Extruder | 1 set |
4 | Non-stop Screen Changer | 1 set |
5 | Melt Pump | 1 set |
6 | Die Head | 1 set |
7 | Quenching Bath | 1 set |
8 | Water-suction Device | 1 set |
9 | First Heating and Stretching Rollers | 1 set |
10 | Hot Air Oven | 1 set |
11 | Second Heating and Stretching Rollers | 1 set |
12 | Third Stretching Rollers | 1 set |
13 | Shaping Oven | 1 set |
14 | Fourth Haul-off Rollers | 1 set |
15 | Winder | 2 sets |
16 | Control System | 1 set |
Qingdao Trusty Plastic Machinery Company is a professional company specialize in designing and manufacturing plastic extrusion machine. We introduced and absorbed the advanced plastic processing technology, which can provide the technology and machinery one-step service.
Our company's main products are: PVC door and window profile production line, WPC wood-plastic profile production line, PVC wall panel production line, PVC/PE/PPR pipe production line, crust-foamed board production line, PE/PP/PC hollow sheet production line, PVC roof tile production line and PET packing belt production line, etc. According to customers' needs, to achieve diversified processing customization.
1.WHY CHOOSE US
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.WHAT SERVICES DO WE OFFER?
Pre-sale communication → Design proposal, signature confirmation→
Customized production→ Test machine before shipment →Package &
delivery→ Engineer installation→Training operator → Technical support
3.PAYMENT TERMS:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.DELIVERY CONDITIONS:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
5.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6.INSPECTION
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.INSTALLATION AND EQUIPMENT COMMISSIONING:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.