PP PE ABS Plastic Sheet Making Machine/ Board/ Panel Production Extruder
Customer Device Feedback:
Final Products:
Product Description:
Board width
|
500-2000mm
|
Board thickness
|
3-30mm
|
Max. extrusion capacity
|
350-800kg/h
|
Production line speed
|
15m/min
|
Processing Type
|
Extruding Machine
|
Factory Condition:
Location |
Indoors |
Power Supply |
No dangerous area |
Humidity |
≤95% |
Temperature |
0-40ºC |
Power |
3-phase, 380V, 50Hz |
Total Installed Power |
150KVA(Depends on machine model) |
Cooling Water |
≤25ºC ≥0.3MPa, outdoor water tank: 15-20m³, water circulated with production line |
Compressed air |
0.3 m³ /min, >0.5MPa,
Equipped with 4-5.5kw air compressor |
Production Line Dimension |
20m*3m*3.5m |
Company Profile:
Combining with scientific research, technology transfer, production and distribution, Qingdao Trusty Plastic Machinery Co., Ltd. is a technology-oriented company. Our company has been awarded many honorable titles, such as Qingdao Hi-Tech Enterprise, Qingdao Contract-Honoring and Promise-Keeping Enterprise and the Accomplished Unit of Extending Important Scientific and Technological Achievements for Constructing Well-Off Dwelling House.
We are mainly engaged in the research and development, design and after-sales service of plastic machinery. Furthermore, our company can offer clients turn-key projects of whole production lines of plastic products. With strong technical capabilities, our company boasts top grade professional technicians of macromolecule materials, polymer processing, industrial automation and distribution. With a good understanding of the market trend, we have closely cooperated with chemical design academies to ensure the utilization of the latest technology achievements into production as quickly as possible. As a result, our company can offer clients professional technical consulting services with the most competitive capacity.
After Service:
- After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply,
water supply, labors and cranes, etc.
- Trusty will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
- The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated,
- Engineer will give free training lessons to labors in buyer's factory.
- If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
If you have any questions, please do not hesitate to contact us. We Look forward to listening to you!