High Speed HDPE/PP/PE Pipe Single/Multi Layer Production Extruder Machinery

Product Details
Customization: Available
Warranty: 18months
Product Type: PE Pipe

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
500000 RMB
Plant Area
>2000 square meters
  • High Speed HDPE/PP/PE Pipe Single/Multi Layer Production Extruder Machinery
  • High Speed HDPE/PP/PE Pipe Single/Multi Layer Production Extruder Machinery
  • High Speed HDPE/PP/PE Pipe Single/Multi Layer Production Extruder Machinery
  • High Speed HDPE/PP/PE Pipe Single/Multi Layer Production Extruder Machinery
  • High Speed HDPE/PP/PE Pipe Single/Multi Layer Production Extruder Machinery
  • High Speed HDPE/PP/PE Pipe Single/Multi Layer Production Extruder Machinery
Find Similar Products

Basic Info.

Model NO.
SJ-90/33
Screw No.
Single-screw
Automation
Automatic
Computerized
Computerized
Certification
CE, ISO9001:2008
Customized
Customized
Condition
New
After-sales Service
18months
Engine
Siemens
Inverter
ABB
Cooling Way
Fan Cooling
Suitable Material
HDPE/PPR/PP
Speed
12m/Min
Assembly Structure
Integraltype Extruder
Material
PP HDPE
Feeding Mode
Multiple Feed
Screw Channel
Deep Screw
Finished Product
HDPE Pipe
Engagement System
Site Installation
Temperature Controller
Omron
Selling Point
High Speed/High Output
Transport Package
Shipping
Specification
Standard
Trademark
Trusty
Origin
Qingdao, Shandong
HS Code
84772090
Production Capacity
350kg / H

Product Description


High Speed HDPE/PP/PE Pipe Single/Multi Layer Production Extruder Machinery
High speed PE pipe extrusion line, please have a look.
At the same time,we accept customization.
If you are interested in this kind of equipment, please leave a message. 
High Speed HDPE/PP/PE Pipe Single/Multi Layer Production Extruder Machinery
 
 
High Speed HDPE/PP/PE Pipe Single/Multi Layer Production Extruder Machinery
 
Material Machine model Extruder Pipe diameter(mm) Max.Output(kg/h)
PE/PP TPM-63 SJ-50/38 or SJ-65/33 φ16-φ63 200
TPM-110 SJ-60/38 or SJ-75/33 Φ20-φ110 300
TPM-250 SJ-75/38 or SJ-90/33 Φ63-φ250 550
High Speed HDPE/PP/PE Pipe Single/Multi Layer Production Extruder Machinery
 
 
After-Service
- After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply,
water supply, labors and cranes, etc.

- Trusty will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.

- The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated,

- Engineer will give free training lessons to labors in buyer's factory.

- If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.

Package & Transpotation
 
High Speed HDPE/PP/PE Pipe Single/Multi Layer Production Extruder Machinery
High Speed HDPE/PP/PE Pipe Single/Multi Layer Production Extruder Machinery
High Speed HDPE/PP/PE Pipe Single/Multi Layer Production Extruder Machinery
 
High Speed HDPE/PP/PE Pipe Single/Multi Layer Production Extruder Machinery
High Speed HDPE/PP/PE Pipe Single/Multi Layer Production Extruder Machinery
High Speed HDPE/PP/PE Pipe Single/Multi Layer Production Extruder Machinery

FAQ:
1.Why Choode Us
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.What Services Do We Offer?
Pre-sale communication → Design proposal, signature confirmation→Customized production→ Test machine before shipment →Package &delivery→ Engineer installation→Training operator → Technical support
3.Payment Terms:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.Delivery Conditions:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.

5.Warranty Terms
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.

6.Inspection
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.Installation And Equipment Commissioning:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.

Feel free to contact me!

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier