20-40mm PVC FOUR PIPE EXTRUSION LINE
1.PRODUCT INTRODUCTION
PVC pipe extrusion machine has features of low energy consumption, high output, stable running etc.
The standard PVC pipe extrusion machine include: material feeder, SJSZ series conic twin screw extruder, mould, vacuum calibration tank, spray cooling tank(for big pipe), haul-off, cutter, stacker/automatic belling machine.
It is mainly used in producing various diameters and wall-thickness of PVC pipes for agriculture and constructional plumbing, electrical conduit etc.
2.EQUIPMENT LIST
No. |
Equipment list for PVC pipe manufacturing plant |
Quantity |
1 |
Mixing machine |
1 set |
2 |
Auto feeder |
2 sets |
3 |
Conical double screw extruder |
1 set |
4 |
Die head and sizing mold |
customized |
5 |
1st cooling tank |
1 set |
6 |
2nd cooling tank |
1 set |
7 |
haul off device |
1 set |
8 |
auto cutting machine |
1 set |
9 |
Laser printer or ink jet printer |
1 set |
10 |
PVC pipe stacker |
1 set |
11 |
PVC pipe joint belling machine |
1 set |
12 |
Crushing machine |
1 set |
13 |
PVC powder milling machine |
1 set |
14 |
Air compressor |
1 set |
15 |
water chiller |
1 set |
3.TECHNICAL PARAMETER
Diameter range(mm) |
Extruder Model |
Main motor power(KW) |
Max. Capacity(KG/H) |
Max. Haul off speed(m/min.) |
16-40 Dual |
SJSZ-51/105 |
18.5 AC |
150 |
10 |
20-63 Dual |
SJSZ-65/132 |
37 AC |
250 |
15 |
20-63 |
SJSZ-51/105 |
18.5 AC |
120 |
15 |
50-160 |
SJSZ-65/132 |
37 AC |
250 |
8 |
75-160 Dual |
SJSZ-80/188 |
110 AC |
450 |
6 |
63-200 |
SJSZ-65/132 |
37 AC |
250 |
3.5 |
110-315 |
SJSZ-80/156 |
55 AC |
450 |
3 |
315-630 |
SJSZ-92/188 |
110 AC |
800 |
1.2 |
4.Production line photos
5.ABOUT US
Qingdao Trusty Plastic Machinery Co., Ltd. is a professional enterprise engaged in research, development, manufacturing and global sales of plastic machinery.
Our company's main products are:
Various types of extruders
Plastic(PP/PE/PVCHDPE/PPR/PERTPA) pipe production line
Plastic(PP/PE/ABS/PVC/WPC/SPC) sheet production line
Plastic(PVC/WPC) profile production line
Plastic board production line
Plastic granulation line
Plastic mixer
Plastic crusher
Plastic shredder
Plastic pulverizer
Other plastic auxiliary production equipment, etc.
Other plastic auxiliary production equipment, etc.
Our products have been sold to more than 79 countries worldwide,welcome customers from all over the world to visit our company.
5.FAQ
1.WHY CHOOSE US
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.WHAT SERVICES DO WE OFFER?
Pre-sale communication → Design proposal, signature confirmation→
Customized production→ Test machine before shipment →Package &
delivery→ Engineer installation→Training operator → Technical support
3.PAYMENT TERMS:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.DELIVERY CONDITIONS:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
5.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6.INSPECTION
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.INSTALLATION AND EQUIPMENT COMMISSIONING:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.
6.AFTER SALES SERVICE
Technical documentation |
All symbols on the equipment will be in English. We will be responsible for providing the Buyer with a general layout plan, electrical plan, installation orientation and manuals, in English. |
Arrangements for inspection, installation and testing of the equipment |
a. After all of the equipment is delivered to the customer's factory, the Buyer shall be responsible for all preparation work, e.g. electricity supply, water supply, cranes and labor, etc. b. We will prepare visa applications for their engineers, who will assist in the equipment installation and testing at the Buyer's factory. c. The Buyer will buy a round-trip air ticket for the engineer(s) after the visa application is approved. The Buyer is responsible for all expenses generated, e.g. visa application fees, meals, accommodation and an allowance of $80.00 per day for each engineer. d. The engineer(s) will provide free training for the operators and maintenance people, in Buyer's factory. e. If the Buyer does not request commissioning by our engineer(s) within four months from the date of the bill of lading, it will be accepted that all the equipment has been successfully tested and approved by the Buyer. |
Quantity and quality guarantee |
a. In cases of quantity discrepancies or equipment damage, at the destination, the Buyer will file a claim within 30 days after the arrival of the goods at its destination. The insurance company and the shipping company will be responsible for all discrepancies and damage caused by the shipping company or other transportation companies. b. Guarantee period and after-sales services: 13 months from the date of the bill of lading. During this guarantee period, if there is a quality issue, we will provide spare parts without charge. If malfunctions are caused by the Buyer's improper operation of equipment, we will provide the Buyer with spare parts at cost prices. c. Long-term service: Beyond one year, we will provide the Buyer with spare parts at reasonable prices and provide long-term technical guidance. |
IF YOU NEED WE HOPE YOU CAN EMAIL ME