• PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine
  • PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine
  • PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine
  • PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine
  • PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine
  • PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine

PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine

Warranty: 14 Months
Product Type: PVC Pipe
Screw No.: Double-screw
Automation: Automatic
Computerized: Computerized
Certification: CE, ISO9001:2008
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
SJSZ-65/132
Customized
Customized
Condition
New
After-sales Service
Oversea Installation & Debugging
Transport Package
Wooden Packing
Specification
Customized
Trademark
Trusty
Origin
Qingdao, China
HS Code
84772090
Production Capacity
10 Sets/Month

Product Description

PVC UPVC CPVC PIPE MACHINE PIPE PRODUCTION LINE

PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine

PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine

 
PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine
PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine


1.PRODUCTION INTRODUCTION
 
PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine
PVC pipe extrusion machine has features of low energy consumption, high output, stable running etc.
 The standard PVC pipe extrusion machine include: material feeder, SJSZ series conic twin screw extruder, mould, vacuum calibration tank, spray cooling tank, haul-off, cutter, stacker.
It is mainly used in producing various diameters and wall-thickness of PVC pipes for agriculture and constructional plumbing, electrical conduit etc.

 

2.MACHINE LIST
 
No. Equipment list for PVC pipe manufacturing plant Quantity
1 Mixing machine 1 set
2 Auto feeder 2 sets
3 Conical double screw extruder 1 set
4 Die head and sizing mold customized
5 1st  cooling tank 1 set
6 2nd  cooling tank 1 set
7 haul off device 1 set
8 auto cutting machine 1 set
9 Laser printer or ink jet printer 1 set
10 PVC pipe stacker 1 set
11 PVC pipe joint belling machine  1 set
12 Crushing machine 1 set
13 PVC powder milling machine 1 set
14 Air compressor 1 set
15 water chiller 1 set

3.Technical parameter
 
Diameter range(mm) Extruder Model Main motor   power(KW) Max. Capacity(KG/H) Max. Haul off   speed(m/min.)
16-40 Dual SJSZ-51/105 18.5 AC 150 10
20-63 Dual SJSZ-65/132 37 AC 250 15
20-63 SJSZ-51/105 18.5 AC 120 15
50-160 SJSZ-65/132 37 AC 250 8
63-200 SJSZ-65/132 37 AC 250 3.5
110-315 SJSZ-80/156 55 AC 450 3
315-630 SJSZ-92/188 110 AC 800 1.2

4.Advantages

1.Replacement molds can produce pipes with different diameters.

2.With a set of molds to produce two or four tubes at the same time.Increased production efficiency.

3.More cost-effective production line.

4.Greatly saving the use of the factory space.

5.High energy efficiency.Just a set of power systems.

6.Can significantly reduce the number of operators.

7.Simple operation.

Our machine can produce the PVC pipe with diameter from 16mm to 630mm



5.Production Flow

Material →Heating Cooling Mixer →Material Feeding →Conical Twin Screw Extruder →Extrusion Mould & calibrator → vacuum Calibration Cooling Tank → (Spray Cooling Tank) →Printer → Haul-off Unit →cutter →stacker
PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine
PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine


6.Auxiliary machine

1. PVC pipe machine- SWP-360 crusher machine
2. PVC pipe machine-Heating &Cooling Mixing unit
(We recommend use SRH-300/600 Mixer)-Mix PVC pipe formula 
3.500MILLING MACHINE-recycle pipes
4.AUTOMATIC PIPE BELLING MACHINE 

 
PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine
PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine



PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine
7.ABOUT US

Qingdao Trusty Plastic Machinery Co., Ltd. is a professional plastic extrusion equipment manufacturer integrating design, research and development, production and sales.
The company's main products are rich, the production technology is mature, and the after-sales service is guaranteed. Products are sold at home and abroad, such as: Brazil, Chile, Mexico, the Philippines, Italy, Russia, Pakistan, Vietnam, India, Algeria, Egypt and other countries.

Our company is located in Qingdao, one of the plastic machinery bases in China, where the railway, sea transportation, aviation and other transportation systems are very complete. And it is one of the regions with rapid economic development in the coastal cities.The advantaged geographical conditions have provided great convenience for the development of the company's trade.

Our company's main products are: PVC door and window profile production line, WPC wood-plastic profile production line, PVC wall panel production line, PVC/PE/PPR pipe production line, PVC/WPC crust foam board production line, PE/PP/PC hollow sheet production line, PVC roof tile production line and PET packing belt production line, etc. According to customers' needs, to achieve diversified processing customization.

Over the years, the company has always adhered to the tenet of "honesty for basis, quality for living, innovation as the theme, and development as the focus", abide by the quality commitment to users, and won the trust of customers.


8.FAQ


1.WHY CHOOSE US
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.

2.WHAT SERVICES DO WE OFFER?
Pre-sale communication  Design proposal, signature confirmation
Customized production Test machine before shipment Package &
delivery Engineer installationTraining operator  Technical support

3.PAYMENT TERMS:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).

4.DELIVERY CONDITIONS:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.

5.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.

6.INSPECTION
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.

7.INSTALLATION AND EQUIPMENT COMMISSIONING:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.

9.AFTER SALES SERVICES
 
Technical documentation
All symbols on the equipment will be in English. We will be responsible for providing the Buyer with a general layout plan, electrical plan, installation orientation and manuals, in English.
Arrangements for inspection, installation and testing of the equipment
a. After all of the equipment is delivered to the customer's factory, the Buyer shall be responsible for all preparation work, e.g. electricity supply, water supply, cranes and labor, etc.
b. We will prepare visa applications for their engineers, who will assist in the equipment installation and testing at the Buyer's factory.  
c. The Buyer will buy a round-trip air ticket for the engineer(s) after the visa application is approved. The Buyer is responsible for all expenses generated, e.g. visa application fees, meals, accommodation and an allowance of $80.00 per day for each engineer.
d. The engineer(s) will provide free training for the operators and maintenance people, in Buyer's factory.
e. If the Buyer does not request commissioning by our engineer(s) within four months from the date of the bill of lading, it will be accepted that all the equipment has been successfully tested and approved by the Buyer.
Quantity and quality guarantee
a. In cases of quantity discrepancies or equipment damage, at the destination, the Buyer will file a claim within 30 days after the arrival of the goods at its destination. The insurance company and the shipping company will be responsible for all discrepancies and damage caused by the shipping company or other transportation companies. 
b. Guarantee period and after-sales services: 13 months from the date of the bill of lading.
During this guarantee period, if there is a quality issue, we will provide spare parts without charge. If malfunctions are caused by the Buyer's improper operation of equipment, we will provide the Buyer with spare parts at cost prices. 
c. Long-term service:
Beyond one year, we will provide the Buyer with spare parts at reasonable prices and provide long-term technical guidance.

PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine
PVC CPVC Pipe Making Machine Production Line Double/Four Pipe Machine




 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now