Customization: | Available |
---|---|
After-sales Service: | Oversea Installation &Debugging |
Warranty: | 14month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Plastic PP Strap Band Making Machine by Single Screw Extruder
1. Product Introduction
PP strap production line is used to produce mechanical or manual bands with 100% PP recycled granules as materials, if raw materials, it will be better. This kind of band is widely used in the packing of kinds of fields such as mines, general merchandise, weaving, electrical equipment, apparatus, architecture, medicine, etc.
Material | Extruder | Width | Strap quantity | Output kg/h | |
PP | Ø75 | 5-19 | 2 | 120-150 | |
PP | Ø90 | 5-19 | 4 | 200-250 | |
PP | Ø120 | 5-19 | 4-8 | 300-350 | |
PET/PP | Ø90 | 9-19 | 2 | PP | 150-200 |
PET/PP | Ø90 | 9-19 | 2 | PET | 200-250 |
PET | Ø110 | 9-25 | 4 | 350-400 |
Strap width | 9-25mm |
Production speed | ≤160m/min X 4(2) |
straps quantity | 2-4 straps |
Max.output | 400kg/h |
2. Machine List
NO. | Component | Feature1 | Feature2 |
1 | Drying dehumidifacation crystalization system |
Energy efficiency | Feeding devices |
Self-adjustment of the system | Rapidity in production shift | ||
Optimal and continuous mixing of the material | No risk of contamination | ||
2 | The three components mixing and feeding unit |
Automatic | Increase IV |
With automatic ratio mixing system for raw-material additives | Use-100% bottle flakes | ||
3 | Extruder |
Sevo-extruder can save electric 30% | Low tempreture plastify |
High efficiency screw | No deformation at high temperature | ||
4 | Back-flush screen changer |
Continuous Back-flush screen changer make the produce non-stop | Full automatic self-cleaning |
optimal design of the melt flow way - short melt residence time | low pressure build up - to prevent thermal variations of the melt | ||
no dead spots for fast changes of material or color |
operational reliability and long durability | ||
5 | Melt measuring pump | world's leading elastomer extrusion pumps | over 100 years experience |
Protect extrusion equipment | reduce energy consumption | ||
Provide accurate system pressure for the mold | Continuously obtain stable product quality | ||
6 | Cooling tank | Stainless steel/Lifting tension/ | water removal system to maintain tension |
7 | Stretching machine | Frequency control | mold tempreture machine control roller surface tempreture |
8 | stretching oven | High-performance insulation layer save energy | Maintain the constant tempreture of the strap |
9 | Embossing device |
High-precision make strap with goof friction | Ensure the accuracy and consistency of strap pattern |
Enhance the friction for strap |
Enhance the strength for strap |
||
Unique technology | World leading high precision standards | ||
10 | Winder |
Sevo-motor controls winder dispalcement width and distance | Increase the value of strap |
Manual control or computer control is optional | Servo wiring is set by computer according to strap specifications | ||
Automatically adjust the winding tension | The winding curve of the strap reel is perfect |
Photos
Extruder | |
Mould | |
Water cooling tank | |
Haul off | |
Stretching Oven | |
Embossing Unit | |
Calibration Cooling Tank | |
Double Station Winder |
3. Company Profile
Qingdao Trusty Plastic Machinery Co., Ltd. is a professional plastic extrusion equipment manufacturer integrating design, research and development, production and sales.
The company's main products are rich, the production technology is mature, and the after-sales service is guaranteed. Products are sold at home and abroad, such as: Brazil, Chile, Mexico, the Philippines, Italy, Russia, Pakistan, Vietnam, India, Algeria, Egypt and other countries.
Our company is located in Qingdao, one of the plastic machinery bases in China, where the railway, sea transportation, aviation and other transportation systems are very complete. And it is one of the regions with rapid economic development in the coastal cities.The advantaged geographical conditions have provided great convenience for the development of the company's trade.
Over the years, the company has always adhered to the tenet of "honesty for basis, quality for living, innovation as the theme, and development as the focus", abide by the quality commitment to users, and won the trust of customers.
4. After Sales Service
(1)After the machines are finished, the seller will test all machines before shipment. If the buyer can not come to test the machine, we will test the machines and send the sample to buyer.
(2)After shipment, the seller will send one or two technicians to the buyer' s factory to help the buyer install the machine and train workers for buyer.
(3)We will supply all electricity drawing, machine installation drawing.
(4)When make shipment, we will put some spare electricity parts for free, like the barrel hearers, thermcouples, breakers, relays, and other items which is easier broken.
5. FAQ
1.WHY CHOOSE US
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.WHAT SERVICES DO WE OFFER
Pre-sale communication → Design proposal, signature confirmation→Customized production→ Test machine before shipment →Package &delivery→ Engineer installation→Training operator → Technical support
3.PAYMENT TERMS
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.DELIVERY CONDITIONS
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
5.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6.INSPECTION
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.INSTALLATION AND EQUIPMENT COMMISSIONING
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.