12-32mm PVC/UPVC Double Pipe Extrusion Line

  • Audited Supplier
  • 8 yrs

Contact Supplier

Product Highlights

  • High Output Efficiency: SJSZ twin-screw extruder with double-tube single-control calibration for efficient production.
  • Energy Saving Design: Special mould one-time extrusion two pipes, saving land and labor costs effectively.
  • Customized Components: Key parts customized with Siemens, Omron, ABB, and Simens brands upon request.
  • Overseas Installation: Engineers provided for installation, debugging, and worker training at buyer's factory.
  • CE Certified Quality: Professional manufacturer ensuring quality machines with CE certification and support.

Product Images of 12-32mm PVC/UPVC Double Pipe Extrusion Line

12-32mm PVC/UPVC Double Pipe Extrusion Line
12-32mm PVC/UPVC Double Pipe Extrusion Line pictures & photos
12-32mm PVC/UPVC Double Pipe Extrusion Line
12-32mm PVC/UPVC Double Pipe Extrusion Line pictures & photos
12-32mm PVC/UPVC Double Pipe Extrusion Line
12-32mm PVC/UPVC Double Pipe Extrusion Line pictures & photos
12-32mm PVC/UPVC Double Pipe Extrusion Line
12-32mm PVC/UPVC Double Pipe Extrusion Line pictures & photos
12-32mm PVC/UPVC Double Pipe Extrusion Line
12-32mm PVC/UPVC Double Pipe Extrusion Line pictures & photos
12-32mm PVC/UPVC Double Pipe Extrusion Line
12-32mm PVC/UPVC Double Pipe Extrusion Line pictures & photos
12-32mm PVC/UPVC Double Pipe Extrusion Line
  • 12-32mm PVC/UPVC Double Pipe Extrusion Line
  • 12-32mm PVC/UPVC Double Pipe Extrusion Line
    12-32mm PVC/UPVC Double Pipe Extrusion Line
  • 12-32mm PVC/UPVC Double Pipe Extrusion Line
    12-32mm PVC/UPVC Double Pipe Extrusion Line
  • 12-32mm PVC/UPVC Double Pipe Extrusion Line
    12-32mm PVC/UPVC Double Pipe Extrusion Line
  • 12-32mm PVC/UPVC Double Pipe Extrusion Line
    12-32mm PVC/UPVC Double Pipe Extrusion Line
  • 12-32mm PVC/UPVC Double Pipe Extrusion Line
    12-32mm PVC/UPVC Double Pipe Extrusion Line
  • 12-32mm PVC/UPVC Double Pipe Extrusion Line
    12-32mm PVC/UPVC Double Pipe Extrusion Line

Find Similar Products

Product Description


PVC UPVC Double Pipe Making Machine Production Line 

 
12-32mm PVC/UPVC Double Pipe Extrusion Line
 
1. Company Profile

12-32mm PVC/UPVC Double Pipe Extrusion Line

Qingdao Trusty Plastic Machinery Co., Ltd. is a professional plastic extrusion equipment manufacturer integrating design, research and development, production and sales.
Our company is located in Qingdao, one of the plastic machinery bases in China, where the railway, sea transportation, aviation and other transportation systems are very complete. And it is one of the regions with rapid economic development in the coastal cities.The advantaged geographical conditions have provided great convenience for the development of the company's trade.

 
Our company's main products are: PVC door and window profile production line, WPC wood-plastic profile production line, PVC wall panel production line, PVC/PE/PPR pipe production line, PVC/WPC crust foam board production line, PE/PP/PC hollow sheet production line, PVC roof tile production line and PET packing belt production line, etc. According to customers' needs, to achieve diversified processing customization.
 
12-32mm PVC/UPVC Double Pipe Extrusion Line

Over the years, the company has always adhered to the tenet of "honesty for basis, quality for living, innovation as the theme, and development as the focus", abide by the quality commitment to users, and won the trust of customers.


2. PRODUCTION INTRODUCTION
 
PVC double pipe production line is developed for high output of double pipe extrusion together. The main machine, SJSZ-51/105 , SJSZ-65/132conical twin-screw extruder, is equipped with double-tube single-control stainless steel spraying calibration which avoids waste condition when one tube is adjusted and the other one is affected. The auto single-control double pipe haul-off and cutter unit is combined with the front double calibration technology to make operation more flexible.
The machine with energy efficient conical twin-screw extruder and through special mould one-time extrusion two piece of PVC pipe, effective energy conservation, can improve the production and efficiency, save land and labor costs.

The diameter of the extruded pipe is from 16-63mm. It can fully use the extruding capacity of the extruder. So, it is your best choice for high output and efficient for PVC double pipe extrusion line.
12-32mm PVC/UPVC Double Pipe Extrusion Line
 

3. Production Flow

PVC powder + additive → mixing → spring feeding → twin screw extruder → mould and calibrator → vacuum forming machine → haul off machine → cutting machine → stacker
 


4.Configuration
 
Twin conical screw extruder 12-32mm PVC/UPVC Double Pipe Extrusion Line
Mould 12-32mm PVC/UPVC Double Pipe Extrusion Line
Double Vacuum forming/spraying tank 12-32mm PVC/UPVC Double Pipe Extrusion Line
Double Haul-off unit 12-32mm PVC/UPVC Double Pipe Extrusion Line
Double cutter 12-32mm PVC/UPVC Double Pipe Extrusion Line
Stacker 12-32mm PVC/UPVC Double Pipe Extrusion Line


5. Technical Parameter
 
Extruder Pipe diameter(mm) Output(kg/hour) Total Power(KW)
SJZ-51/105 16-40 120 75
SJZ-55/120 16-40 150 90
SJZ-65/132 25-63 250 125


6. After Sales Service
 
12-32mm PVC/UPVC Double Pipe Extrusion Line
(1)After the machines are finished, the seller will test all machines before shipment. If the buyer can not come to test the machine, we will test the machines and send the sample to buyer.
 
(2)After shipment, the seller will send one or two technicians to the buyer' s factory to help the buyer install the machine and train workers for buyer.

(3)We will supply all electricity drawing, machine installation drawing.
 
(4)When make shipment, we will put some spare electricity parts for free, like the barrel hearers, thermcouples, breakers, relays, and other items which is easier broken.


7. FAQ

1.WHY CHOOSE US
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.WHAT SERVICES DO WE OFFER?
Pre-sale communication → Design proposal, signature confirmation→
Customized production→ Test machine before shipment →Package &
delivery→ Engineer installation→Training operator → Technical support
3.PAYMENT TERMS:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.DELIVERY CONDITIONS:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
5.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6.INSPECTION
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.INSTALLATION AND EQUIPMENT COMMISSIONING:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.

About the Supplier

This supplier has been audited by BV. Verify the report on the official BV website with ID "MIC-ASI215293". Items marked "verified" are certified.

Watch Video
Watch Video
QINGDAO TRUSTY PLASTIC MACHINERY CO., LTD.
QINGDAO TRUSTY PLASTIC MACHINERY CO., LTD.
QINGDAO TRUSTY PLASTIC MACHINERY CO., LTD.
QINGDAO TRUSTY PLASTIC MACHINERY CO., LTD.
QINGDAO TRUSTY PLASTIC MACHINERY CO., LTD.
QINGDAO TRUSTY PLASTIC MACHINERY CO., LTD.
QINGDAO TRUSTY PLASTIC MACHINERY CO., LTD.
QINGDAO TRUSTY PLASTIC MACHINERY CO., LTD.

About Our Factory & Business Background

verified Business Type
Manufacturer/Factory & Trading Company
Address
E12 District, Jiaozhou Steel Market, Jiaozhou, Qingdao, Shandong, China
verified Terms of Payment
T/T
verified International Commercial Terms(Incoterms)
FOB
verified Average Lead Time
Peak Season Lead Time: one month
Off Season Lead Time: one month
verified Nearest Port
Qingdao Port

Our Production Capability & Technical Expertise

Main Products
Plastic Pipe Making Machine, Plastic Profile Extruder Machine, Plastic Sheet/Board Extrusion Machine, Plastic Production Extruder, Plastic Machine, Corrugated Pipe Making Machine, Fiber Reinforced Pipe Making Machine, Plum Pipe Making Machine, Sikinning Foam Board Production Line, Resin Tile Production Line
verified Production Machines
Drilling Machine, Lathe, Milling Machine, Sawing Machine
verified OEM Service Available
Yes

Our Industry Experience & Global Business Record

Export Year
2019-04-15
verified Main Markets
South America, Southeast Asia/ Mideast, Africa, Domestic, South Asia
verified Number of Foreign Trading Staff
1
verified Overseas Agent/Branch
No

FAQ

What is the warranty period?
The warranty period is 12 months, starting from the machine receipt in the customer's warehouse. Free services and spare parts are provided during this period.
What are the payment terms?
30% of the total amount should be paid by T/T as a down payment. The balance (70%) should be paid before delivery by T/T or irrevocable L/C at sight.
What is the delivery time?
Delivery is within 30-60 working days after receipt of the advanced payment. Packing and readiness for shipment occur within 15 working days after full payment receipt.
Do you provide overseas installation services?
Yes, we send one or two technicians to the buyer's factory for installation and training. The buyer covers food, accommodation, round-trip tickets, and pays the engineer $100 USD/day.
What spare parts are provided for free?
We supply free spare electrical parts such as barrel heaters, thermocouples, breakers, and relays, which are prone to breaking, during shipment.
What is the production capacity/output?
Output varies by model: SJZ-51/105 outputs 120 kg/hour, SJZ-55/120 outputs 150 kg/hour, and SJZ-65/132 outputs 250 kg/hour.
Can the machine be customized?
Yes, the machine is customized. Key components like contactors, relays, inverters, and motors can be specified from brands like Siemens, Omron, ABB, and Simens.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now