1.Company Profile
Qingdao Trusty Plastic Machinery Company is located in Qingdao shandong peninsula, a beautiful coastal city, where railway, sea and aviation are very convenient.It is one of the coastal cities with rapid economic development.
New and old customers are willing to visit our company to guide and jointly develop new requirements, new standards, new technologies and new processes in this industry.We are in unremitting efforts to work with you to create a brilliant tomorrow.
Our company manages each kind of plastic machinery, has the rich mature technical experience. The quality of the equipment is reliable, and the price is reasonable.
2.Production Introduction
PE pipe production line adopts high efficiency extruder. The screw adopts structure with barrier and mixing head.And the barrel adopts new type slotting barrel, good plasticizing and mixing efficiency.It has large extrusion quantity and it's very stable.
PE pipe production line has r large diameter thick wall pipe design of spiral die head.And the die head has the characters of melt temperature, mixing performance, low cavity pressure and stable production.
PE pipe production line adopts the special technology of sizing and cooling system, using water film lubrication and water ring type cooling, to ensure the stability of diameter and roundness of the high-speed production of thick wall pipe.
3.Machine List
Name |
Quantity(set) |
Automatic drying feeder |
1 |
Single screw extruder |
1 |
Marker line extruder |
1 |
Extruding mould |
1 |
Shaper |
1 |
Vacuum tank |
1 |
Spray box |
1 |
Haul off with caterpillar |
1 |
Computer printer |
1 |
Chipless cutter |
1 |
Roll over table |
1 |
Crusher |
1 |
4.Technical Parameter
Model |
SJ-65 |
Total installation power(kw) |
90 |
Transformer (kw) |
100 |
Actual electricity consumption(kw) |
60 |
Capacity (kg\h) |
120-180 |
Line speed (m\min) |
5-10 |
Pipe Diameter(mm) |
20-63 |
Motor Power(kw) |
37 |
5.Production Process
Feed→Extrude→Shape→Spray→Haul off→Print→Cut→Stack the material→Crush
6.After sales service
(1)After the machines are finished, the seller will test all machines before shipment. If the buyer can not come to test the machine, we will test the machines and send the sample to buyer.
(2)After shipment, the seller will send one or two technicians to the buyer' s factory to help the buyer install the machine and train workers for buyer.
(3)We will supply all electricity drawing, machine installation drawing.
(4)When make shipment, we will put some spare electricity parts for free, like the barrel hearers, thermcouples, breakers, relays, and other items which is easier broken.