PPR AND PERT PIPE PLASTIC MACHINE
China hot cold water supply ppr pipe production line / extrusion machine
high speed PPR pipe production line / extrusion making machine
Multiple Layer PPR Hot / Cold Water Supply Pipe Production Line
PPR PIPE PRODUCTION LINE
ppr HOT COLD WATER SUPPLY PIPE PRODUCTION LINE
1.PRODUCT INTRODUCTION
This production line is mainly used for the production of pipe material with PP-R resin as raw material, but also suitable for the production of pipe material with PE-RT, Pb, PE-X resin as raw material.
Application:
1. Man-machine interface operation, high degree of automation.
2. Using special screw, plasticizing effect is good.
3. Adopt compound spiral head, effectively remove material memory function.
4. Vacuum shaping and constant temperature control eliminate the stress of pipe material.
5. Adopt co-extrusion machine head and increase the standard color line of pipe material.
6.Large extrusion capacity, low melt temperature, melt temperature uniform.
7.A wide range of material processing.
2.Technical Parameter
Model |
Extruder |
Diameter(mm) |
Motor Power(kw) |
Capacity(kg/h) |
L/D(L/D) |
SJ-63 |
SJ65 |
20-63 |
45 |
80-150 |
33:1 |
SJ-110 |
SJ75 |
63-110 |
55 |
150-200 |
33:1 |
3.FAQ
1.WHY CHOOSE US
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.WHAT SERVICES DO WE OFFER?
Pre-sale communication → Design proposal, signature confirmation→
Customized production→ Test machine before shipment →Package &
delivery→ Engineer installation→Training operator → Technical support
3.PAYMENT TERMS:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.DELIVERY CONDITIONS:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
5.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6.INSPECTION
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.INSTALLATION AND EQUIPMENT COMMISSIONING:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.
4.ABOUT US
Qingdao Trusty Plastic Machinery Co., Ltd. is a professional enterprise engaged in research, development, manufacturing and global sales of plastic machinery.
Our company's main products are:
Various types of extruders
Plastic pipe production line
Plastic sheet production line
Plastic profile production line
Plastic board production line
Plastic granulation line
Plastic mixer
Plastic crusher
Plastic shredder
Plastic pulverizer
Other plastic auxiliary production equipment, etc.
Our products have been sold to more than 79 countries worldwide,welcome customers from all over the world to visit our company.
AFTER SERVICE
1. We not only provide machines but also offer technical guide and market evaluate.
2. We will provide all the machines for the complete production according to customer's requirements.
3. We will provide good service for machine installation and training, until the customers can run the machines and make stably production.
4. For long-term cooperation, we always provide good quality, good price and good service to customer.