Customization: | Available |
---|---|
After-sales Service: | Provide |
Warranty: | 18months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item | SJ-70*33 | SJ-80*33 | SJ-90*33 |
Screw Diameter | 70mm | 80mm | 90mm |
Fiber Diameter | 0.13-0.35mm | 0.13-0.35mm | 0.13-0.35mm |
Fiber Type | PP/PE/HDPE Monofilament Yarn For Making Rope or Net | ||
Ratio of L/D | 33 | 33 | 33 |
Rotation Speed of Screw | 20-90r/min | 20-90r/min | 20-90r/min |
Drawing Ratio | 4-10 | 4-10 | 4-10 |
Cooling Mode | Water cooling | Water cooling | Water cooling |
Power Consumpstion | 100KW/65KW | 130KW/80KW | 150KW/100KW |
Max Output capacity | 1200KG/24H | 2000KG/24H | 3000KG/24H |
Machine Dimension(L*W*H) | 20*3*2.5M | 23*3*2.5M | 27*3*2.5M |
No | Description | Quantity |
1 | SJ-90/33 Single Screw Extruder | 1 set |
2 | Automatic Screen Changer | 1 set |
3 | Mold | 1 set |
4 | Water Tank Cooling System | 1 set |
5 | The first seven haul off machine | 1 set |
6 | Water heating oven | 1 set |
7 | The secend seven haul off machine | 1 set |
8 | Glazing machine | 1 set |
9 | Air oven | 1 set |
10 | The third seven rollers haul off machine | 1 set |
11 | Winding machine | 1 set |
12 | Shaping machine | 1 set |
13 | Cutting machine | 1 set |
14 | Packing machine | 1 set |
1.PP raw material enters the extruder in the form of circular wire into the cold zone of the cold water tank, which is then drawn by the first draft machine, followed by heating into the hot water tank to increase the tension.
2.After passing through the hot water, the circular wire is drawn twice by the second drafter.
3.After passing through the second draft machine, enter the oven for heating and finalizing.
4.After the heating is set, the embossing is carried out by the indentation machine, and then the third drafting is carried out, and finally the cutting process is carried out by the cutting machine.
Set up joint adjustment and linkage device for the main engine and traction to realize synchronous adjustment of speed, stable process and easy operation.
The tractor adopts helical gear transmission, point-to-point centralized lubrication, low noise, large transmission torque, stable performance and long service life.
Hot and cold water tank and stretch roller are made of 304 stainless steel, beautiful and corrosio.
Qingdao Trusty Plastic Machinery Company is a professional company specialize in designing and manufacturing plastic extrusion machine. We introduced and absorbed the advanced plastic processing technology, which can provide the technology and machinery one-step service.
Our company's main products are: PVC door and window profile production line, WPC wood-plastic profile production line, PVC wall panel production line, PVC/PE/PPR pipe production line, crust-foamed board production line, PE/PP/PC hollow sheet production line, PVC roof tile production line and PET packing belt production line, etc. According to customers' needs, to achieve diversified processing customization.
1.Why choose us?
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.What service do we offer?
Pre-sale communication → Design proposal, signature confirmation→
Customized production→ Test machine before shipment →Package &
delivery→ Engineer installation→Training operator → Technical support
3.Payment terms:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.Dlivery conditions:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
5.Warranty terms:
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6.Inspection:
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.Installation and Equipment Commissioning:
If the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.