Plastic PVC Foam Board Production Machine Crust Foam Sheet Extruding Line
If you are finding a trustworthy long-term oversea plastic extrusion manufacurer partner?
Trusty is your first choice!
WPC/PVC Crust Foam Board Production Line
Detailed Images:
Extrusion System
Name: SJZ80/156 conical twin screw extruder
Technical parameters:
a.Main motor :75kw Siemens Brand.
b.Inverter:ABB
c.Screw barrel: 38CrMoAl, hardness Hv950 or more , high-efficiency and long service life.
d. Vacuum pump : Double station.
Mould Part
Name: Extrusion and calibration mould
Technical parameters:
a.Unique die structure for hollow products using core molding optimized flow path through computer simulation to ensure uniform and stable flow.
b.Independent air flow control system to quickly balance the airflow in a short time to obtain a stable production .
c.Fine polishing of the cavity , lip and flowing channel.
Hydraulic shaping table
Material : stainless steel
The adjustment mode of stock mould height: Pneumatic
Haul-off Roller
Name: Haul-off unit
Technical parameters:
a.High quality rubber on the surface.
b.Surface shore hardness 65-70.
c.Roller thicknee is more than 18mm.
d.Increase the diameter of shaft heads and bearings ensure stable operation of thick board.
e.Double-row chain drive,forward and backward roller transmission coefficient is consistent .
Cutter
Name: Cutter
Technical parameters:
a.Special positioning to ensure cutting accurecy.
b.Special knife structure, safe and stable
c.PLC control system, double dust system.
Final Products
After-Service
- After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply,
water supply, labors and cranes, etc.
- Trusty will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
- The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated,
- Engineer will give free training lessons to labors in buyer's factory.
- If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
Package & Transpotation
FAQ:
1.Why Choode Us
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.What Services Do We Offer?
Pre-sale communication → Design proposal, signature confirmation→Customized production→ Test machine before shipment →Package &delivery→ Engineer installation→Training operator → Technical support
3.Payment Terms:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.Delivery Conditions:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
5.Warranty Terms
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6.Inspection
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.Installation And Equipment Commissioning:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.