Customization: | Available |
---|---|
Warranty: | 14 Months |
Product Type: | Brush/Broom/Rope/Net |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.The production line consists of dehumidifying and crystallizing system, extruder, screen changer, Meter pump, mold, haul-off, oven, and winder, etc.
2.Production Process:
Automatic material loader→Extruder→Screen changer→Mould→Cooling water tank→First pulling and stretching unit→Hot water tank→Second pulling and stretching unit→Oil coating→Heating oven→ The Third pulling and stretching unit→Oil coating →Heating oven→Fourth fulling and stretching unit→winding→shaping→wrapping→cutting.
Feature
1.Eco-friendly and Extensive Use: With 100% recycled PET bottle flakes, PP pellets, or PE pellets to produce high quality monofilament, like broom filament, brush filament, Chrismas tree filament, fishing net wire, construction safety net, rope filament, etc.
2. Mature Technology and High Performance: New technology, hot wind cycles to dry, increase the viscosity of the bottle flakes material; secondary stretching, increase the tensile strength and elongation, the belt tension reaches more than 10000N
3.Energy Conservation: Precise and energy saving temperature control system, power saving, low noise, low input and high yield.
Technical Parameter
Power supply | 380V,3 phase,50HZ |
Raw material | PET granules or 100% PET bottle fakes material |
Diameter of final product | 0.05-2.5mm |
Capacity | 40-250kg/hour |
Manpower | 2 persons/shift |
Machine Dimension | 35*2*2.5m |
Model | Max Output |
SJ-75/33 | 70kg/h |
SJ-90/33 | 120kg/h |
SJ-120/33 | 250kg/h |
Main Configuration
No. | Name | Quantity |
1 | SJ80/33 single screw extruder | One set |
2 | Die head | One set |
3 | Water-cooling tank | One set |
4 | First tensile machine | One set |
5 | Water-heating tank | One set |
6 | Second tensile machine | One set |
7 | Third tensile machine | One set |
8 | Oil bath tank | One set |
9 | Pneumatic tensioner | One set |
10 | two position winder | One set |
Detail Photos
Application
Qingdao Trusty Plastic Machinery Co., Ltd. is a professional plastic extrusion equipment manufacturer integrating design, research and development, production and sales.
Our company's main products are: PVC door and window profile production line, WPC wood-plastic profile production line, PVC wall panel production line, PVC/PE/PPR pipe production line, PVC/WPC crust foam board production line, PE/PP/PC hollow sheet production line, PVC roof tile production line and PET packing belt production line, etc. According to customers' needs, to achieve diversified processing customization.
FAQ
1.WHY CHOOSE US
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.WHAT SERVICES DO WE OFFER?
Pre-sale communication → Design proposal, signature confirmation→Customized production→ Test machine before shipment →Package &delivery→ Engineer installation→Training operator → Technical support
3.PAYMENT TERMS:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.DELIVERY CONDITIONS:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
5.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6.INSPECTION
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.INSTALLATION AND EQUIPMENT COMMISSIONING:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.