WPC Terrace Decking Extrusion line
1. Machine List
| No. |
Item |
| 1 |
Screw feeder |
| 2 |
SJSZ 65/132 conical twin screw extruder |
| 3 |
Extrusion mould |
| 4 |
Embossing device |
| 5 |
Calibration device |
| 6 |
Cutting device |
| 7 |
Stocker |
2 Machine Photos
2.1.Extruder
The equipment adopts a conical twin screw extruder, which ensures more stable extrusion and is more conducive to improving surface smoothness. The screw is equipped with double-layer insulated heaters, saving over 30% energy. Omron PID temperature controller, temperature control error ±1°C.
2.2.Mould
The die adopts a co-extrusion structure design. The co-extrusion flow channel is located at the rear end of the forming section, making the co-extruded surface layer more uniform and increasing production speed. At the profile extrusion outlet, inline embossing is performed before cooling, with an embossing depth of approximately 0.5 mm, resulting in a stronger three-dimensional effect.
2.3. Haul-off unit
An auxiliary haul-off device is installed at the rear end of the calibration table to reduce cold-top extrusion resistance and increase production speed. When used together with embossing rollers, it makes extrusion more stable and improves the forming effect.
2.4.Stocker
The unloading rack is 6 meters long, meeting different order length requirements. The unloading rack is equipped with buffer strips to prevent profile damage.
3.Final product:
4. Application:
5.About Us
Our company's main products are:
PVC door and window profile production line
WPC wood-plastic profile production line
PVC wall panel production line
PVC/PE/PPR/PP pipe production line
PP/PE/ABS board/sheet production line
PVC/WPC crust foam board production line
PE/PP/PC hollow sheet production line
PVC roof tile production line
PP/PET packing belt production line
According to customers' needs, to achieve diversified processing customization.
Over the years, the company has always adhered to the tenet of "honesty for basis, quality for living, innovation as the theme, and development as the focus", abide by the quality commitment to users, and won the trust of customers.
6.FAQ
1.PAYMENT TERMS:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
2.DELIVERY CONDITIONS:
2.1 Delivery condition: FOB Qingdao port or CIF destination Port.
2.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
3.WARRANTY TERMS
3.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
3.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
3.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.