PVC UPVC Double Pipe Making Machine Production Line
1. PRODUCTION INTRODUCTION
PVC double pipe production line is developed for high output of double pipe extrusion together. The main machine, SJSZ-51/105 , SJSZ-65/132conical twin-screw extruder, is equipped with double-tube single-control stainless steel spraying calibration which avoids waste condition when one tube is adjusted and the other one is affected. The auto single-control double pipe haul-off and cutter unit is combined with the front double calibration technology to make operation more flexible.
The machine with energy efficient conical twin-screw extruder and through special mould one-time extrusion two piece of PVC pipe, effective energy conservation, can improve the production and efficiency, save land and labor costs.
The diameter of the extruded pipe is from 16-63mm. It can fully use the extruding capacity of the extruder. So, it is your best choice for high output and efficient for PVC double pipe extrusion line.
2. Production Flow
PVC powder + additive → mixing → spring feeding → twin screw extruder → mould and calibrator → vacuum forming machine → haul off machine → cutting machine → stacker
3. Technical Parameter
Extruder |
Pipe diameter(mm) |
Output(kg/hour) |
Total Power(KW) |
SJZ-51/105 |
16-40 |
120 |
75 |
SJZ-55/120 |
16-40 |
150 |
90 |
SJZ-65/132 |
25-63 |
250 |
125 |
4.Configuration
Twin conical screw extruder |
|
Mould |
|
Double Vacuum forming/spraying tank |
|
Double Haul-off unit |
|
Double cutter |
|
Stacker |
|
5. Company Profile
Qingdao Trusty Plastic Machinery Co., Ltd. is a professional plastic extrusion equipment manufacturer integrating design, research and development, production and sales.
Our company's main products are: PVC door and window profile production line, WPC wood-plastic profile production line, PVC wall panel production line, PVC/PE/PPR pipe production line, PVC/WPC crust foam board production line, PE/PP/PC hollow sheet production line, PVC roof tile production line and PET packing belt production line, etc. According to customers' needs, to achieve diversified processing customization.
6. After Sales Service
(1)After the machines are finished, the seller will test all machines before shipment. If the buyer can not come to test the machine, we will test the machines and send the sample to buyer.
(2)After shipment, the seller will send one or two technicians to the buyer' s factory to help the buyer install the machine and train workers for buyer.
(3)We will supply all electricity drawing, machine installation drawing.
(4)When make shipment, we will put some spare electricity parts for free, like the barrel hearers, thermcouples, breakers, relays, and other items which is easier broken.
7. FAQ
1.WHY CHOOSE US
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.WHAT SERVICES DO WE OFFER?
Pre-sale communication → Design proposal, signature confirmation→
Customized production→ Test machine before shipment →Package &
delivery→ Engineer installation→Training operator → Technical support
3.PAYMENT TERMS:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.DELIVERY CONDITIONS:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
5.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6.INSPECTION
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.INSTALLATION AND EQUIPMENT COMMISSIONING:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.