Customization: | Available |
---|---|
After-sales Service: | Oversea Installation&Debugging |
Warranty: | 14month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
PET STRAP BAND(one strap,two strap,4 straps) MAKING MACHINE
PP STRAP BAND(one strap,two strap,4 straps) EXTRUSION LINE
PP/PET packing belt extrusion machinery
PP,PET multi straps band production line
Product Width:
6--32mm
Product Thickness:
0.4--1.8mm
Features
1. PET strap band extrusion line is mainly for producing PET strap.
2. The raw material can be 100% recycled material, which can reduce the Pproduce cost and get a good profit.
3. The PET bale is the substitution of the steel strap and has a lot of advantages such as good extension,
4. High temperature resistant, easy use.
5. It is mainly suitable for packaging for various trades.
PP Strap Machine model
Model | SJ-65 | SJ-75 | SJ-90 |
Extruder | SJ-65/30 | SJ-75/30 | SJ-90/30 |
Productivity | 60-100kg/h | 80-120kg/h | 120-150kg/h |
Drive Motor | 22kw | 30kw | 55kw |
Two-station Winder | 80-120m/min,adjustable | ||
Strap Size | Width:5mm-20mm | Width:10mm-25mm | Width:20mm-35mm |
Thickness:0.36mm-1.0mm | Thickness:0.5mm-1.3mm | Thickness:0.5mm-1.8mm | |
Installed Capacity | about40kw | about 60kw | about80kw |
Line Dimension | 26m×2m×2.2m (L×W×H) | 26m×3m×3m (L×W×H) | 26m×5m×3.5m (L×W×H) |
Machine List
NO. | Component | Feature1 | Feature2 |
1 | Drying dehumidifacation crystalization system |
Energy efficiency | Feeding devices |
Self-adjustment of the system | Rapidity in production shift | ||
Optimal and continuous mixing of the material | No risk of contamination | ||
2 | The three components mixing and feeding unit |
Automatic | Increase IV |
With automatic ratio mixing system for raw-material additives | Use-100% bottle flakes | ||
3 | Extruder |
Sevo-extruder can save electric 30% | Low tempreture plastify |
High efficiency screw | No deformation at high temperature | ||
4 | Back-flush screen changer |
Continuous Back-flush screen changer make the produce non-stop | Full automatic self-cleaning |
optimal design of the melt flow way - short melt residence time | low pressure build up - to prevent thermal variations of the melt | ||
no dead spots for fast changes of material or color |
operational reliability and long durability | ||
5 | Melt measuring pump |
world's leading elastomer extrusion pumps | over 100 years experience |
Protect extrusion equipment | reduce energy consumption | ||
Provide accurate system pressure for the mold | Continuously obtain stable product quality | ||
6 | Cooling tank | Stainless steel/Lifting tension/ | water removal system to maintain tension |
7 | Stretching machine | Frequency control | mold tempreture machine control roller surface tempreture |
8 | stretching oven | High-performance insulation layer save energy | Maintain the constant tempreture of the strap |
9 | Embossing device |
High-precision make strap with goof friction | Ensure the accuracy and consistency of strap pattern |
Enhance the friction for strap |
Enhance the strength for strap |
||
Unique technology | World leading high precision standards | ||
10 | Winder |
Sevo-motor controls winder dispalcement width and distance | Increase the value of strap |
Manual control or computer control is optional | Servo wiring is set by computer according to strap specifications | ||
Automatically adjust the winding tension | The winding curve of the strap reel is perfect |
Detailed Photos
Pre-Drying Tower Pre-drying the PET flakes crystallization so it can increase the drying speed and line capacity |
|
Dehumidifier Machine Honeycomb model; Inside made by Stainless steel |
|
Single Screw Extruder Screw made by 38CrMnAIA with nitriding treatment |
|
Die Mould Strap shape molding, the size and thickness can adjustable |
|
Haul-off Machine Motor speed adjust by inverter |
|
Hot Air Circulation Oven Machine
With the air blower cycling the hot air for full and equal heating up
|
|
Stress Relief Machine With cooling forming tank |
|
Automatic Winder Machine With length meter to calculate the length an automatic change |
FAQ
1.WHY CHOOSE US
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.WHAT SERVICES DO WE OFFER?
Pre-sale communication → Design proposal, signature confirmation→
Customized production→ Test machine before shipment →Package &
delivery→ Engineer installation→Training operator → Technical support
3.PAYMENT TERMS:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.DELIVERY CONDITIONS:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
5.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6.INSPECTION
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.INSTALLATION AND EQUIPMENT COMMISSIONING:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.