PRODUCT INTRODUCTION
1. Using the recycling bottle slices as raw materials by making them melt directly,
which reduces the course of raw material-making
2. With the multi-purpose machine, it can produce PET straps in different specifications
directly and doesn't need to change the mould head
3. The products has the same transparency as made from new polyester slices, but
the tensile strength and shock resistance are stronger
4. Low energy consumption, high production capability
5. Easy to operate, saves manpower
Main parameters
Model |
CMPET 65-1 |
CMPET 75-2 |
CMPET 90-2 |
Band number |
One |
Two |
Two |
Band specification |
9~19mm(Width) 0.5-1.50mm(Thickness) |
9~19mm(Width) 0.5-1.50mm(Thickness) |
Output |
50kg/h |
100kg/h |
150kg/h |
Water flux |
0.6 m3/h |
Water pipe diameter |
3/2″,water temp according PET strap size |
Compressed Air flux |
0.25 m3/min |
Compressed Air pressure |
0.6Mpa |
Total Power |
132kw |
186kw |
285kw |
The length of production line |
25-28m |
28-33m |
35-40m |
Power |
380V 50HZ or Customized |
Scope of Supply
No. |
Description |
Qty. |
1 |
PET200 Efficient dehumidification drying preliminary crystal system |
1 set |
2 |
Three constituents mixing and feeding system |
1 set |
3 |
Single screw extruder |
1 set |
4 |
Double-column exhausting hydraulic screen changer |
1 set |
5 |
High temperature melt pump |
1 set |
6 |
PET extrusion dies |
1 set |
7 |
Water cooling tank |
1 set |
8 |
The first 5-roller preheating unit |
1 set |
9 |
Convection oven |
1 set |
10 |
The first stretching machine |
1 set |
11 |
The second stretching machine |
1 set |
12 |
Embossing machine |
1 set |
13 |
Heat setting machine |
1 set |
14 |
Water cooling tank |
1 set |
15 |
3-roller traction machine |
1 set |
16.1 |
Double-position winding machine (PLC controlled) |
2 sets |
16.2 |
Double-position winding machine (mechanical) |
2 sets |
17 |
Electrical Control system |
1 set |
18 |
Technical Information |
1 Manual |
Company Introduction
Qingdao Trusty Plastic Machinery Co., Ltd. is a professional enterprise engaged in research, development, manufacturing and global sales of plastic machinery.
Our company's main products are:
Various types of extruders
Plastic pipe production line
Plastic sheet production line
Plastic profile production line
Plastic board production line
Plastic granulation line
Plastic mixer
Plastic crusher
Plastic shredder
Plastic pulverizer
Other plastic auxiliary production equipment, etc.
Our products have been sold to more than 79 countries worldwide,welcome customers from all over the world to visit our company.
FAQ
1.WHY CHOOSE US
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.WHAT SERVICES DO WE OFFER?
Pre-sale communication → Design proposal, signature confirmation→
Customized production→ Test machine before shipment →Package &
delivery→ Engineer installation→Training operator → Technical support
3.PAYMENT TERMS:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.DELIVERY CONDITIONS:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
5.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6.INSPECTION
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.INSTALLATION AND EQUIPMENT COMMISSIONING:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.
After sales service
1. We not only provide machines but also offer technical guide and market evaluate.
2. We will provide all the machines for the complete production according to customer's requirements.
3. We will provide good service for machine installation and training, until the customers can run the machines and make stably production.
4. For long-term cooperation, we always provide good quality, good price and good service to customer.