PP/PET packing belt extrusion machinery
PP,PET multi straps band production line
1.PRODUCT INTRODUCTION
This production line can produce different with and thickness of PP PET strap according to client's requirement. This extrusion line is mainly for producing PP PET strap. The raw material can be 100% recycled material, which can reduce the produce cost and get a good profit. And the PP PET belt is the substitution of the steel strap and has lots of advantages such as good extension, high temperature resistance, easy use, etc
The PET /PP packing belt has the characteristic of high stretch-resistant,low extend rate,
impact-resistant,good flexible,easy for operate ,cheap and safe.
Now it is widely used in the steel industry, chemical fiber industry, aluminum ingots, paper, brick kiln industry, tobacco industry,electronics, textiles and wood, etc.
It is perfect substitute of steel belt,used in packing paper ,wood work ,textile,cotton,fibre and pallet.
2.FEATURES
1. The machine adjusts is conversion motor as power source .
2. The mechanical transmission adopts soft connection.
3. Its rotation is exact and smooth, saving power and low noise.
4. PET has advantages ,such as good stiffness , high temperature resistant ,its specific gravity is 1/5 the one of steel.
5. It is mainly suitable for packing for various trades.
6 Its characteristics: high tensile strength ,small percentage elongation, resistance to impact, not easy to be broken ,cheap, good softness, convenient operation, safe and reliable .
7. In the world ,it is an ideal substitute of steel belt.
8. It is widely used in paper making, wooden products, textile cotton and fiber ,color metal, canned products, chemical , metallurgy, power cable, aluminum.
9.Plastics shaped materials and other products and various kind of trays.
10.The use of the product is convenient, it can adopt common steel fastening for connection.
11.It also is suitable for various kinds of hand-operated of table packing machine and large auto packing machine of enterprises.
12.It adopts hot-melting connection sticks.
3.Machine List
Machine Name |
Quantity |
PET dehumidifing & crystallization system |
one set |
PET-SJ-90 single extruder |
one set |
Filter Exchanger |
one set |
Machine head mould |
one set |
Water cooling tank |
one set |
Drying system |
one st |
First pre heating machine |
one set |
First tensile pre heating machine |
one set |
Second tensile embossing cooling machine |
one set |
Tight hot calibration machine |
one set |
Third haul-off machine |
one set |
Shortwave infrared ray heating tank |
Two sets |
Double winder |
one set |
Electric control system |
one set |
4.Technical parameter
Model |
SJ65/30-PP |
SJ90/30-PP/PET |
SJ100/30-PP/PET |
SJ120/33-PP/PET |
Material |
PP |
PP/PET |
PP/PET |
PP/PET |
Strap Width |
8-19MM |
5-32MM |
5-32MM |
5-32MM |
Thickness of strap |
0.45-1.25MM |
0.45-1.5MM |
0.45-1.5MM |
0.45-1.5MM |
Production speed |
≤120M/min |
≤120M/min |
≤120M/min |
≤120M/min |
Outlet of Die head |
2 straps one time |
2 or 4 straps one time |
2 or 4 straps one time |
4 or 6 straps one time |
Stretching ratio |
4-6 |
4-6 |
4-6 |
4-6 |
Max. capacity |
100kgs/h |
120kgs/h |
200kgs/h |
400kgs/h |
5.Detailed Images
Pry-Drying Tower: Pre-drying the PET flakes crystallization so it can increase the drying speed and line capacity.
Single Screw Extruder: Screw made by 38CrMnAIA with nitriding treatment.
Die Mold: Strap shape molding, the size and thickness can adjustable.
Haul-off Machine: Motor speed adjust by inverter.
Hot Air Circulation Oven Machine: With the air blower cycling the hot air for full and equal heating up.
Stress Relief Machine: With cooling forming tank.
Automatic Winder Machine: With length meter to calculate the length an automatic change disc.
6.ABOUT US
Qingdao Trusty Plastic Machinery Co., Ltd. is a professional plastic extrusion equipment manufacturer integrating design, research and development, production and sales.
The company's main products are rich, the production technology is mature, and the after-sales service is guaranteed. Products are sold at home and abroad, such as: Brazil, Chile, Mexico, the Philippines, Italy, Russia, Pakistan, Vietnam, India, Algeria, Egypt and other countries.
Our company is located in Qingdao, one of the plastic machinery bases in China, where the railway, sea transportation, aviation and other transportation systems are very complete. And it is one of the regions with rapid economic development in the coastal cities.The advantaged geographical conditions have provided great convenience for the development of the company's trade.
Our company's main products are: PVC door and window profile production line, WPC wood-plastic profile production line, PVC wall panel production line, PVC/PE/PPR pipe production line, PVC/WPC crust foam board production line, PE/PP/PC hollow sheet production line, PVC roof tile production line and PET packing belt production line, etc. According to customers' needs, to achieve diversified processing customization.
Over the years, the company has always adhered to the tenet of "honesty for basis, quality for living, innovation as the theme, and development as the focus", abide by the quality commitment to users, and won the trust of customers.
7.FAQ
1.WHY CHOOSE US
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.WHAT SERVICES DO WE OFFER?
Pre-sale communication → Design proposal, signature confirmation→
Customized production→ Test machine before shipment →Package &
delivery→ Engineer installation→Training operator → Technical support
3.PAYMENT TERMS:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.DELIVERY CONDITIONS:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
5.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6.INSPECTION
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.INSTALLATION AND EQUIPMENT COMMISSIONING:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.
8.AFTER SALES SERVICE
Technical documentation |
All symbols on the equipment will be in English. We will be responsible for providing the Buyer with a general layout plan, electrical plan, installation orientation and manuals, in English. |
Arrangements for inspection, installation and testing of the equipment |
a. After all of the equipment is delivered to the customer's factory, the Buyer shall be responsible for all preparation work, e.g. electricity supply, water supply, cranes and labor, etc. b. We will prepare visa applications for their engineers, who will assist in the equipment installation and testing at the Buyer's factory. c. The Buyer will buy a round-trip air ticket for the engineer(s) after the visa application is approved. The Buyer is responsible for all expenses generated, e.g. visa application fees, meals, accommodation and an allowance of $80.00 per day for each engineer. d. The engineer(s) will provide free training for the operators and maintenance people, in Buyer's factory. e. If the Buyer does not request commissioning by our engineer(s) within four months from the date of the bill of lading, it will be accepted that all the equipment has been successfully tested and approved by the Buyer. |
Quantity and quality guarantee |
a. In cases of quantity discrepancies or equipment damage, at the destination, the Buyer will file a claim within 30 days after the arrival of the goods at its destination. The insurance company and the shipping company will be responsible for all discrepancies and damage caused by the shipping company or other transportation companies. b. Guarantee period and after-sales services: 13 months from the date of the bill of lading. During this guarantee period, if there is a quality issue, we will provide spare parts without charge. If malfunctions are caused by the Buyer's improper operation of equipment, we will provide the Buyer with spare parts at cost prices. c. Long-term service: Beyond one year, we will provide the Buyer with spare parts at reasonable prices and provide long-term technical guidance. |